9 November 2009
The building owner of the Telco Building, 16 Kingston Street, Auckland requires a metering upgrade of both the Level 1 power supply and the gate meter at street level.
* Date: Saturday 14th November 2009
* Time Window: 07:00am - 11:00am
* Work Scheduled: Power Metering Upgrade
CityLink will be switching over to generator power for the duration of the work, as the building mains supply will need to be turned off.
No interruption to customer power supply is anticipated; our UPS will ensure a smooth transition to generator power.
If you experience any problems with your CityLink service, please contact the CityLink 24 hour number, 04 385 9003 or 0800 4 CITYLINK (0800 424 895) Option 3 to advise you have a fault with your CityLink service quoting the relevant circuit reference number.